ETN Home

OQforAll

EnergyU.org
Course Catalog:

192-0101 Characteristics and Hazards of Natural Gas
192-0201 Gas Detection
192-0202 Isolation of a Gas Compressor Unit
192-0205 Compressor Station Inspection and Testing
192-0301 Operating a Gas Compressor Unit
192-0302 Shutting Down a Gas Compressor Unit
192-0303 Starting a Gas Compressor Unit
192-0401 Corrosion Monitoring - Atmospheric, External, and Internal
192-0402 Coating Maintenance
192-0505 Cathodic Protection System Testing
192-0512 Pipe-to-Soil Testing
192-0701 Locating, Installing, and Protecting Customer Meters and Regulators
192-0702 Customer Pressure Regulating, Limiting,
              and Relief Devices - Operation and Maintenance
192-0801 Locating Pipelines
192-0802 Protection During Disturbance of Segment Support
192-0803 Inspection for Damage
192-0901 System Patrolling 192-1002 Plastic Pipe - Electrofusion
192-1003 Plastic Pipe - Butt Heat Fusion
192-1004 Plastic Pipe - Sidewall Heat Fusion
192-1005 Mechanical Joints
192-1006 Plastic Pipe - Socket Heat Fusion
192-1201 Leakage Survey: Distribution and Transmission
192-1202 Outside Gas Leakage Investigation, Pinpointing, and Grading
192-1301 Leak and Strength Test - Service Lines, Mains, and Transmission Lines
192-1203 Inside Gas Leakage Investigation
192-1401 Abandonment or Inactivation of Facilities
192-1402 Backfilling
192-1403 Installation of Steel Pipe - Field Bends
192-1404 Casing Vents and Seals
192-1405 Underground Clearances
192-1408 Installation of plastic pipe
192-1409 Installation of Steel Pipe
192-1410 Cover - Service Lines, Mains and Transmission Lines
192-1411 Inspection
192-1413 Line Markers
192-1414 Pipeline Shutdown, Startup, or Pressure Change
192-1415 Protection from Hazards
192-1417 Protection when Minimum Cover not Met
192-1418 Purging
192-1419 Uprating: Reinforce or Anchor Offsets, Bends, and Dead-ends
192-1421 Installation of Steel Pipe - Repair of Imperfections or Damage
192-1422 Segment Repair, Replacement, Etc.
              (Service Lines, Mains and Transmission Lines)
192-1424 Support and Anchor Maintenance - Exposed Pipeline
192-1425 Tapping Cast and Ductile Iron Pipe
192-1426 Tapping Steel and Plastic Pipe
192-1427 Valve Maintenance
192-1430 Internal Sealing - Cast Iron and Ductile Iron Segments
192-1431 Segment Removal
192-1432 Leak Clamps and Sleeves
192-1501 Odorization - Mains and Transmission Lines
192-1802 Vault Maintenance
192-1803 Pressure Regulating, Limiting, and Relief Device - Operation and Maintenance
192-2010 Service Line Replacement
192-2011 Prevention of Accidental Ignition
192-2014 Service Lines Not In Use and Service Discontinuance
192-2301 Uprating Steel Pipelines to a Pressure that will
              Produce a Hoop Stress 30% or More of SMYS
192-2302 Uprating Pipelines to a Pressure that will
              Produce a Hoop Stress Less than 30% SMYS
192-2401 Welding
192-2402 Visual Inspection of Welds
192-2403 Nondestructive Testing of Welds
192-2405 Miter Joints
192-1001 Cast Iron Joints - Sealing
192-0501 Cathodic Protection System Maintenance
192-0503 Cathodic Protection Systems - Electrical Connections
192-0511 Soil Resistivity Testing
195-0403 Corrosion Monitoring - Internal Corrosion
195-0407 Application & Repair of External Coatings
195-0501 Cathodic Protection System Maintenance: Maintain Rectifier
195-0503 Cathodic Protection Systems - Electrical Connections: Maintain Test Leads
195-0505 Cathodic Protection System Testing: Inspect Rectifier
195-0514 Conduct Annual Cathodic Surveys
195-0514 Electrically Inspect Bare Pipe
195-0515 Installing or Repairing Anodes or Anode Beds
195-0801 Locating Pipelines
195-0804 Inspection Following Excavation Activities and Leak Survey After Blasting
195-0805 Inspect Existing Pipe Following Movement
195-0806 Inspection Activities for Tie-ins, Pipeline Replacements,
              or Other Components Connecting To an Existing Pipeline
195-0807 Underwater Inspection of Pipeline and Reburial in the Gulf of Mexico and its Inlet
195-0808 Inspect (Examine) Buried Pipe When Exposed
195-1204 Inspect Surface Conditions of right of Way & Perform Leak Surveys
195-1206 Leakage Survey
195-1301 Conduct Pressure Tests
195-1305 Test Overfill Protection Devices
195-1401 Abandoning, Safe Disconnect Purging, and Sealing Of Pipeline Facilities
195-1402BF Backfilling a Trench Following Maintenance
195-1402MP Moving in-Service Pipe
195-1405CG Inspection of Clearance of Existing Pipe to Underground Structures
195-1405CM Measure Clearance From Existing Pipe to Underground Structures
              Installed by Excavation, Boring, Directional Drilling
195-1413 Line Markers
195-1414PS Pipeline Shutdown, Startup or Pressure Change
195-1414LR Operate Pressure Relieving Devices For Launching and Receiving Facilities
195-1418PG Purge Gas from Pipeline
195-1418PA Purge Air from Pipeline
195-1422 Internal Corrosion Remediation
195-1427VI Inspect Valves 195-1427VR Valve Repair
195-1427VM Valve Maintenance
195-1505 Maintain Fixed Gas Detection Equipment
195-1506 Operate Odorate Equipment
195-1507 Monitor Odorate Level
192-1802T Vault Maintenance
195-1804 Inspect, Test, and Calibrate Relief Valves
195-1805 Maintain/Repair Relief Valves
195-1806 Inspect, Test, and Calibrate Pressure Limiting Devices
195-1807 Inspect, Test, and Calibrate Pressure Switches and Transmitters
195-1808 Verify or Set Protection Parameters For Programmable Controllers
              and/or Instrumentation Control Loops
195-1819 Rest Remote Control Shutdown Devices
195-2301 Perform Incremental Test Pressures to Uprate MAOP
195-2401 Welding on Existing Pipelines
195-2705 CPM (Computational Pipeline Monitoring) Leak Detection